Twproject Blog
Project management trends & insights.
Latest product updates
-
Implementing a project: steps to follow
A project implementation plan is a core strategic document that keeps the team’s work on track. It is a tremendously valuable planning tool that can make or break your project’s success or failure. It is a fairly comprehensive document, and it may be challenging for those who have never created one before. However, don’t worry! … Continue reading “Implementing a project: steps to follow”
Choose the category you are interested in:
AgileComparisonCost managementPm expertProduct updatesProductivityProject managementResource managementTime managementUsage tips
-
Twproject 5.2 patch 59003
A little patch release, available here http://www.twproject.com/download.page No database or “jar” (library) changes.
-
Teamwork available in Japanese
Teamwork 5.2 now includes a Japanese version of the user interface. We have also published a presentation of Teamwork on the website for Japanese speakers here.
-
Teamwork 5.2: refining planning, costs and more customization flexibility
We just released Teamwork 5.2 (build 59000) here: http://www.twproject.com/download.page This release comprises a wide set of improvements, ranging from custom fields in several new sections to cost management, to improved planning integrations. We’ve also done several user interface improvements and bug fixes. This is a free upgrade for all users of version 5. Database schema … Continue reading “Teamwork 5.2: refining planning, costs and more customization flexibility”
-
Teamwork 5.1: Project trees and more
We just released Teamwork 5.1 (build 57001) here: http://www.twproject.com/download.page Contains a new view, task trees, and a subtle but important extension in functionality for “staff” selection. This is a free upgrade for all users of version 5. There are no changes in the database structure with respect to version 5. Task trees Thanks to user … Continue reading “Teamwork 5.1: Project trees and more”
-
Teamwork 5.0.2 patch 56000
A little patch release, available here: http://www.twproject.com/download.page No database or “jar” (library) changes. Changes – A new parameter is available in task, issue and assignment custom fields: adding “required” at the end of the comma separated parameter value makes it a mandatory field. – More robust upgrade procedure from Teamwork 4 to 5 … Continue reading “Teamwork 5.0.2 patch 56000”
-
Teamwork 5.0.2 patch release
We just released a patch for Teamwork 5.0 here: http://www.twproject.com/download.page Mainly small bug fixes, and some improvements in the jQuery Gantt editor. No changes in the database structure. Bugs fixed – “When you click on an operator for Load Detail screen, it always goes to the top left corner which can be off the … Continue reading “Teamwork 5.0.2 patch release”
-
jQuery Gantt editor – the code explained
In this blog post, Teamwork’ developer Roberto Bicchierai explains the JavaScript magic behind Teamwork Gantt editor, demo online available here http://gantt.twproject.com. Teamwork version 5 includes it as main project tree editor.
-
Teamwork patch 5.0.1 released
We just released a patch for Teamwork 5, version 5.0.1 (build 53500). Download it here. This patch contains mainly bug fixes: – installations with “non empty context path”, that is, where Teamwork is not running as root application had problems – fixed a bug in setting English or American default settings. – read SVN logs … Continue reading “Teamwork patch 5.0.1 released”
-
Teamwork 5: Gantt, planning, new design & more
A major Teamwork release, Teamwork 5, is now available for download here: http://www.twproject.com/download.page In the same page you can generate a 15 day evaluation license. (inclusive of the mobile version) Teamwork’s costs have not changed, all details: http://www.twproject.com/licensing.page The base cost is 90 Euro per non-expiring license, and the upgrade cost is 35 Euro (44$) … Continue reading “Teamwork 5: Gantt, planning, new design & more”
-
Teamwork conceptual evolution leading to version 5
Teamwork’s design and user interface has evolved in time, adapting to the evolution of web based tools and user needs and habits. Version 3. In version 3 Teamwork was a solid and standard web application, before web applications were widely used for management. Version 4. With Version 4 we introduced gamification elements (before they became … Continue reading “Teamwork conceptual evolution leading to version 5”
-
Twproject free online Gantt editor
Twproject’s team in its core developer instance (Roberto Bicchierai) has released a free online service for designing “Gantts” online, here: This editor is a Gantt editor as for functionality, but it actually supports the more extended functionality of Twproject modeling, supporting task state management as distinct from dates management. Supports multi assignments, dependencies, drag&drop, zooming … Continue reading “Twproject free online Gantt editor”
-
Teamwork 4.8 – Plan your issues
With the new Teamwork version 4.8 a new tool for organizing your issues is released. In addition to the issue organizer which lets you change task, assignee, gravity and status simply dragging your issues in different columns, there is now also a new functionality, the issue planner, that helps you schedule issues in time. Here … Continue reading “Teamwork 4.8 – Plan your issues”