{"id":41922,"date":"2026-11-26T08:00:00","date_gmt":"2026-11-26T08:00:00","guid":{"rendered":"https:\/\/twproject.com\/blog\/?p=41922"},"modified":"2026-11-26T08:12:49","modified_gmt":"2026-11-26T08:12:49","slug":"project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work","status":"publish","type":"post","link":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/","title":{"rendered":"Project margins in IT projects: How to measure them when AI transforms the value of work"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For years, the <a href=\"https:\/\/twproject.com\/blog\/profitability-project-evaluate-concretely\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>project margin<\/strong><\/a> of <a href=\"https:\/\/twproject.com\/teams\/it-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>IT teams<\/strong><\/a>&#8216; projects was calculated with a simple formula: <strong>estimated hours times the rate, compared with hours worked times the hourly cost<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With artificial intelligence, that formula holds up less and less: a feature that used to take three days of development now takes one; on the other hand, <strong>review, testing and fixing hours<\/strong> are growing, often falling on the most expensive profiles in the team.<\/p>\n\n\n\n<div class=\"table-of-content\">\n<h5>CONTENT<\/h5>\n<ul>\n\n<li><a href=\"#when\">When hours no longer tell the whole story<\/a><\/li>\n\n<li><a href=\"#rates\">1. Two rates for each person: what it costs and what it&#8217;s worth to the client<\/a><\/li>\n\n<li><a href=\"#budget\">2. Budget by phase and variances under control<\/a><\/li>\n\n<li><a href=\"#earned\">3. Earned Value: the value of the work done compared with its cost<\/a><\/li>\n\n<li><a href=\"#processes\">Margin depends on all the other processes<\/a><\/li>\n\n<li><a href=\"#temera\">A real case: Temera<\/a><\/li>\n\n<li><a href=\"#want\">Want to see how profitable your projects really are?<\/a><\/li>\n\n\n\n\n<\/ul>\n<\/div>\n\n\n\n<a name=\"when\"><\/a>\n\n\n\n<h2 class=\"wp-block-heading\">When hours no longer tell the whole story<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The result is that two projects with the same number of hours can have very different margins, and the aggregate figure no longer shows where money is made and where it&#8217;s lost. For the IT manager and for whoever signs off the quotes, the question changes: knowing <strong>how many hours<\/strong> were spent isn&#8217;t enough; you need to know <strong>who<\/strong> spent them, <strong>on which phase<\/strong> and <strong>against how much completed work<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In this article we look at how to set up margin control on three levels: <strong>resource hourly cost<\/strong>, <strong>budget by phase<\/strong> and <a href=\"https:\/\/twproject.com\/blog\/earned-value-how-to-evaluate-the-progress-of-a-project\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Earned Value<\/strong><\/a>.<\/p>\n\n\n\n<a name=\"rates\"><\/a>\n\n\n\n<h3 class=\"wp-block-heading\">1. Two rates for each person: what it costs and what it&#8217;s worth to the client<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In a scenario like this, it&#8217;s important to split the hourly cost of IT resources into two levels:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>on the <strong>resource<\/strong>: the actual cost that person has for the company;<\/li>\n\n\n\n<li>on the <strong>assignment<\/strong>: the hourly value at which that person&#8217;s work is &#8220;sold&#8221; to the client on a specific project or phase.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For an IT team this distinction is crucial. The same senior developer can have different rates on a <strong>fixed-price project<\/strong>, a <strong>support contract<\/strong> or an <strong>internal project<\/strong>; and the margin of each project comes precisely from the difference between what the resource costs and the value it&#8217;s billed at.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/twproject.com\/teams\/it-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Twproject<\/strong><\/a>, one of the best <strong><a href=\"https:\/\/twproject.com\/blog\/the-best-project-management-tools-for-it-companies\/\" target=\"_blank\" rel=\"noreferrer noopener\">project management software for IT companies<\/a><\/strong>, lets you make these distinctions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If the company prefers to always work with the actual cost, a configuration option disables the rate on the assignment and propagates every change in hourly cost to all active assignments.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Every hour logged in the <strong>worklog<\/strong> generates an <strong>actual cost<\/strong> on the phase it refers to and, with the option enabled, the actual cost is recorded at the hourly cost in force on the date of entry. So, when a senior profile spends more time reviewing AI-generated code, the cost of the phase visibly rises, even if total hours stay close to the estimate.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"360\" src=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/add-wl-timesheet.png\" alt=\"\" class=\"wp-image-36063\" srcset=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/add-wl-timesheet.png 576w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/add-wl-timesheet-450x281.png 450w\" sizes=\"auto, (max-width: 576px) 85vw, 576px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">You can find out more about these processes in an article dedicated to the <a href=\"https:\/\/twproject.com\/blog\/new-twproject-release-assignment-load-departments\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>release on assignments<\/strong><\/a>.<\/p>\n\n\n\n<a name=\"budget\"><\/a>\n\n\n\n<h3 class=\"wp-block-heading\">2. Budget by phase and variances under control<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The second level is the project <strong>budget<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For each project, and also for each sub-phase, you can add <strong>additional costs<\/strong>, such as software licences, cloud services, hardware or travel, linked to the phase that generated them.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In <strong>Twproject <\/strong>you can set a budget on individual WBS phases: the values of the sub-phases add up and make up the <a href=\"https:\/\/twproject.com\/blog\/how-to-make-a-project-budget\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>project budget<\/strong><\/a>. For each node, the system compares budget, <a href=\"https:\/\/twproject.com\/blog\/how-to-monitor-actual-costs-compared-to-planned-costs\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>planned costs and actual costs<\/strong><\/a>, and shows the forecast and actual margin; when a phase exceeds its limits, the WBS flags it with a red icon.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1212\" height=\"770\" src=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2023\/12\/inserimento_costi.gif\" alt=\"planned costs\" class=\"wp-image-21885\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">On the other side are <strong>revenues<\/strong>: forecast with an estimated date, then recorded as actual with the invoice attached, even as a percentage of the total. The <strong>cash flow <\/strong>of income and expenses is visible on every node of the project, not just on the project as a whole.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For those who want tighter control, there are two configuration options:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>budget lock<\/strong>, which prevents entering costs beyond the allocated budget and requires distributing among sub-phases a total consistent with that of the parent phase;<\/li>\n\n\n\n<li><strong>worklog lock<\/strong>, which doesn&#8217;t allow logging hours beyond the assignment estimate and shows how many hours are still available.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">On a fixed-price IT project, this means noticing that an integration phase is eroding the margin while there&#8217;s still time to act: renegotiate the scope, move a less expensive resource onto repetitive tasks, or open a change request with the client.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"How to Track Project Costs &amp; Budget | Cost Management Tutorial\" width=\"840\" height=\"473\" src=\"https:\/\/www.youtube.com\/embed\/6lqcRZ22xBA?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<a name=\"earned\"><\/a>\n\n\n\n<h3 class=\"wp-block-heading\">3. Earned Value: the value of the work done compared with its cost<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Budget and actuals tell you how much has been spent, but they don&#8217;t tell you whether that spending is in line with the <strong>work actually completed<\/strong>, and this is exactly the critical point when AI speeds up some activities and slows down others. Having used 50% of the budget can be a great sign or a terrible one, depending on how much of the project is really finished.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To answer this question, <strong>release 7.3.001<\/strong> introduced <a href=\"https:\/\/twproject.com\/blog\/new-twproject-release-7-3-001-ai-interactivity-and-the-introduction-of-earned-value-management\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Earned Value Management<\/strong><\/a> in <strong>Twproject<\/strong>. The method compares three values:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Planned Value (PV)<\/strong>: how much should have been spent, according to the plan, for the work scheduled up to today;<\/li>\n\n\n\n<li><strong>Earned Value (EV)<\/strong>: the value of the work actually completed;<\/li>\n\n\n\n<li><strong>Actual Cost (AC)<\/strong>: how much was really spent to complete it.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The reference is the project&#8217;s <strong>financial baseline<\/strong>, a &#8220;snapshot&#8221; of the cost plan taken at the start of the project; it&#8217;s also available via API, for those who want to bring it into their own business intelligence tools.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>EVM report<\/strong> compares the three values on the classic <strong>S-curve<\/strong>: if the actual cost curve is above the earned value curve, you&#8217;re spending more than the work done is worth; if the earned value curve is below the planned one, the project is behind schedule.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"840\" height=\"384\" src=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/earned-value-management-report-840x384.jpg\" alt=\"\" class=\"wp-image-41552\" srcset=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/earned-value-management-report-840x384.jpg 840w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/earned-value-management-report-400x183.jpg 400w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/earned-value-management-report-1536x703.jpg 1536w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/earned-value-management-report-705x323.jpg 705w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/earned-value-management-report.jpg 1866w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">From these values you can derive indicators such as the <a href=\"https:\/\/twproject.com\/blog\/cost-performance-index-how-to-calculate-and-optimize-it\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Cost Performance Index<\/strong><\/a> and the Schedule Performance Index. A CPI below 1 on an IT project is the alarm you need to hear well before the project closes.<\/p>\n\n\n\n<a name=\"processes\"><\/a>\n\n\n\n<h2 class=\"wp-block-heading\">Margin depends on all the other processes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A project&#8217;s margin is the end result of everything that happens before, and in <a href=\"https:\/\/twproject.com\/teams\/it-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Twproject<\/strong><\/a> these processes share the same data:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>#<strong>resource management<\/strong>, because knowing who works on what and with what workload is the basis of every cost estimate;<\/li>\n\n\n\n<li>#<strong>ticket and internal request management<\/strong>, because support hours for a client end up in their project and erode its margin if they aren&#8217;t planned for;<\/li>\n\n\n\n<li>#<strong>planning of hybrid projects<\/strong>, waterfall and agile, on the Gantt chart with dependencies and critical path;<\/li>\n\n\n\n<li>#<strong>portfolio view<\/strong>, to compare the profitability of projects and decide which ones to focus on.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Everything Twproject offers is designed to give you a broader approach to the topic, covering the whole process of <a href=\"https:\/\/twproject.com\/blog\/budgeting-and-management-control-stop-wasting-money\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>budget management to avoid waste<\/strong><\/a>.<\/p>\n\n\n\n<a name=\"temera\"><\/a>\n\n\n\n<h2 class=\"wp-block-heading\">A real case: Temera<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/twproject.com\/customers\/temera\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Temera<\/strong><\/a> is an Italian IT and IoT services company with over 100 employees and four locations worldwide, developing tracking solutions for the luxury sector that combine hardware, software and services. As its international client base and number of projects grew, the tools it was using were no longer enough: the ERP offered only an accounting view, with limited project management features, while the product management tool didn&#8217;t cover costs and project accounting.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With <strong>Twproject<\/strong>, Temera has managed its client projects and their financial control in a single environment, updated in real time, keeping the internal project view separate from the client-facing accounting view. Today more than 15 project managers handle dozens of projects with monthly and quarterly reports, and the company reports a 25% reduction in administrative management work. Its COO sums up the benefit like this:<\/p>\n\n\n\n<p><!-- START QUOTE BOX --> <\/p> <div class=\"quote-box\"> <div class=\"quote-content\"><p>&#8220;Twproject made it easier to manage, control, and report on dozens of projects. It simplified our PMO and saved us significant administrative and internal project control resources that we can now invest in client-facing activities.&#8221;<\/p><\/div> <div class=\"quote-link\">Read <a href=\"https:\/\/twproject.com\/customers\/temera\/\" target=\"_blank\" rel=\"noopener\">the full interview<\/a><a class=\"quote-arrow\" href=\"https:\/\/twproject.com\/customers\/temera\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" src=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2023\/06\/quote-arrow.png\"><\/a><\/div> <\/div>\n\n\n\n<a name=\"want\"><\/a>\n\n\n\n<h2 class=\"wp-block-heading\">Want to see how profitable your projects really are?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Every IT company values its work in its own way: rates by profile, fixed-price projects, support fees, internal projects. That&#8217;s why the quickest way to find out whether <strong>Twproject<\/strong> is right for you is to see it applied to your projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Book a demo with a <strong>dedicated tutor, an expert in IT project management<\/strong>. In one session we&#8217;ll set up one of your real projects together: hourly costs of resources and assignments, budget by phase, additional costs and forecast revenues, all the way to the financial baseline and the Earned Value report with its S-curve, to see where the margin holds and where it&#8217;s being eroded.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\ud83d\udc49 <a href=\"https:\/\/twproject.com\/ask-for-product-demo\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Book your free demo with an IT industry expert tutor now<\/strong><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Prefer to start on your own? <a href=\"https:\/\/demo.twproject.com\/applications\/teamwork\/welcome\/createUserEnvironment.jsp\" rel=\"noreferrer noopener\"><strong>Try Twproject free for 15 days<\/strong><\/a>, no credit card required.<\/p>\n\n\n\n<p><a name=\"team\"><\/a><\/p>\n\n\n\n<div id=\"blog-promo-box\">\n<div class=\"flex_column_table dark pattern-2\">\n<div class=\"flex_column text_column\">\n<div>\n<h3>Project margins under control<\/h3>\n<div class=\"avia-button-wrap avia-button-left\"><a class=\"avia-button avia-icon_select-no avia-color-custom avia-size-xlarge\" href=\"https:\/\/demo.twproject.com\/applications\/teamwork\/welcome\/createUserEnvironment.jsp\" rel=\"noopener\"><span class=\"avia_iconbox_title\">Try Twproject<br>\n<\/span><\/a><\/div>\n<\/div>\n<\/div>\n<div class=\"flex_column photo_column\" style=\")\"><\/div>\n<\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>For years, the project margin of IT teams&#8216; projects was calculated with a simple formula: estimated hours times the rate, compared with hours worked times the hourly cost. With artificial intelligence, that formula holds up less and less: a feature that used to take three days of development now takes one; on the other hand, &hellip; <a href=\"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Project margins in IT projects: How to measure them when AI transforms the value of work&#8221;<\/span><\/a><\/p>\n","protected":false},"author":6,"featured_media":42023,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_custom_body_class":"","_custom_post_class":"","footnotes":""},"categories":[364],"tags":[],"class_list":["post-41922","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-it"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Project margins in IT projects: How to measure them when AI transforms the value of work - Twproject.com<\/title>\n<meta name=\"description\" content=\"AI is changing timelines and profit margins for IT projects. Learn how to manage them using hourly rates, phase-based budgets, and earned value.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project margins in IT projects: How to measure them when AI transforms the value of work - Twproject.com\" \/>\n<meta property=\"og:description\" content=\"AI is changing timelines and profit margins for IT projects. Learn how to manage them using hourly rates, phase-based budgets, and earned value.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/\" \/>\n<meta property=\"og:site_name\" content=\"Twproject.com\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-26T08:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-26T08:12:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/11\/Project-margins-in-IT-projects-How-to-measure-them-when-AI-transforms-the-value-of-work.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"640\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Silvia Randaccio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Silvia Randaccio\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\\\/\"},\"author\":{\"name\":\"Silvia Randaccio\",\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/#\\\/schema\\\/person\\\/147b698444bab9b2e3a7437d9fb25d27\"},\"headline\":\"Project margins in IT projects: How to measure them when AI transforms the value of work\",\"datePublished\":\"2026-11-26T08:00:00+00:00\",\"dateModified\":\"2026-11-26T08:12:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\\\/\"},\"wordCount\":1476,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/twproject.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Project-margins-in-IT-projects-How-to-measure-them-when-AI-transforms-the-value-of-work.webp\",\"articleSection\":[\"IT\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/twproject.com\\\/blog\\\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\\\/\",\"url\":\"https:\\\/\\\/twproject.com\\\/blog\\\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\\\/\",\"name\":\"Project margins in IT projects: How to measure them when AI transforms the value of work - Twproject.com\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/twproject.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Project-margins-in-IT-projects-How-to-measure-them-when-AI-transforms-the-value-of-work.webp\",\"datePublished\":\"2026-11-26T08:00:00+00:00\",\"dateModified\":\"2026-11-26T08:12:49+00:00\",\"description\":\"AI is changing timelines and profit margins for IT projects. Learn how to manage them using hourly rates, phase-based budgets, and earned value.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/twproject.com\\\/blog\\\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\\\/#primaryimage\",\"url\":\"https:\\\/\\\/twproject.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Project-margins-in-IT-projects-How-to-measure-them-when-AI-transforms-the-value-of-work.webp\",\"contentUrl\":\"https:\\\/\\\/twproject.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Project-margins-in-IT-projects-How-to-measure-them-when-AI-transforms-the-value-of-work.webp\",\"width\":960,\"height\":640,\"caption\":\"How to calculate working times using AI - IT teams\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/twproject.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project margins in IT projects: How to measure them when AI transforms the value of work\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/twproject.com\\\/blog\\\/\",\"name\":\"Twproject.com\",\"description\":\"Twproject is a full featured web based project management software that gives you full visibility and control over your projects.Twproject is also a time tracking software, a bug tracking software, a project planning software.\",\"publisher\":{\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/twproject.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/#organization\",\"name\":\"Twproject - Project Management Software\",\"url\":\"https:\\\/\\\/twproject.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/twproject.com\\\/blog\\\/wp-content\\\/uploads\\\/twroject-logo-m.png\",\"contentUrl\":\"https:\\\/\\\/twproject.com\\\/blog\\\/wp-content\\\/uploads\\\/twroject-logo-m.png\",\"width\":331,\"height\":110,\"caption\":\"Twproject - Project Management Software\"},\"image\":{\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/twproject.com\\\/blog\\\/#\\\/schema\\\/person\\\/147b698444bab9b2e3a7437d9fb25d27\",\"name\":\"Silvia Randaccio\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bc4d8e5f48568bc086c341be304425a9d3f741f6ea8d5fd3e40680176927b09e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bc4d8e5f48568bc086c341be304425a9d3f741f6ea8d5fd3e40680176927b09e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bc4d8e5f48568bc086c341be304425a9d3f741f6ea8d5fd3e40680176927b09e?s=96&d=mm&r=g\",\"caption\":\"Silvia Randaccio\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project margins in IT projects: How to measure them when AI transforms the value of work - Twproject.com","description":"AI is changing timelines and profit margins for IT projects. Learn how to manage them using hourly rates, phase-based budgets, and earned value.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/","og_locale":"en_US","og_type":"article","og_title":"Project margins in IT projects: How to measure them when AI transforms the value of work - Twproject.com","og_description":"AI is changing timelines and profit margins for IT projects. Learn how to manage them using hourly rates, phase-based budgets, and earned value.","og_url":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/","og_site_name":"Twproject.com","article_published_time":"2026-11-26T08:00:00+00:00","article_modified_time":"2026-11-26T08:12:49+00:00","og_image":[{"width":960,"height":640,"url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/11\/Project-margins-in-IT-projects-How-to-measure-them-when-AI-transforms-the-value-of-work.webp","type":"image\/webp"}],"author":"Silvia Randaccio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Silvia Randaccio","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/#article","isPartOf":{"@id":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/"},"author":{"name":"Silvia Randaccio","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/147b698444bab9b2e3a7437d9fb25d27"},"headline":"Project margins in IT projects: How to measure them when AI transforms the value of work","datePublished":"2026-11-26T08:00:00+00:00","dateModified":"2026-11-26T08:12:49+00:00","mainEntityOfPage":{"@id":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/"},"wordCount":1476,"commentCount":0,"publisher":{"@id":"https:\/\/twproject.com\/blog\/#organization"},"image":{"@id":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/#primaryimage"},"thumbnailUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/11\/Project-margins-in-IT-projects-How-to-measure-them-when-AI-transforms-the-value-of-work.webp","articleSection":["IT"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/","url":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/","name":"Project margins in IT projects: How to measure them when AI transforms the value of work - Twproject.com","isPartOf":{"@id":"https:\/\/twproject.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/#primaryimage"},"image":{"@id":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/#primaryimage"},"thumbnailUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/11\/Project-margins-in-IT-projects-How-to-measure-them-when-AI-transforms-the-value-of-work.webp","datePublished":"2026-11-26T08:00:00+00:00","dateModified":"2026-11-26T08:12:49+00:00","description":"AI is changing timelines and profit margins for IT projects. Learn how to manage them using hourly rates, phase-based budgets, and earned value.","breadcrumb":{"@id":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/#primaryimage","url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/11\/Project-margins-in-IT-projects-How-to-measure-them-when-AI-transforms-the-value-of-work.webp","contentUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/11\/Project-margins-in-IT-projects-How-to-measure-them-when-AI-transforms-the-value-of-work.webp","width":960,"height":640,"caption":"How to calculate working times using AI - IT teams"},{"@type":"BreadcrumbList","@id":"https:\/\/twproject.com\/blog\/project-margins-in-it-projects-how-to-measure-them-when-ai-transforms-the-value-of-work\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/twproject.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Project margins in IT projects: How to measure them when AI transforms the value of work"}]},{"@type":"WebSite","@id":"https:\/\/twproject.com\/blog\/#website","url":"https:\/\/twproject.com\/blog\/","name":"Twproject.com","description":"Twproject is a full featured web based project management software that gives you full visibility and control over your projects.Twproject is also a time tracking software, a bug tracking software, a project planning software.","publisher":{"@id":"https:\/\/twproject.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/twproject.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/twproject.com\/blog\/#organization","name":"Twproject - Project Management Software","url":"https:\/\/twproject.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png","contentUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png","width":331,"height":110,"caption":"Twproject - Project Management Software"},"image":{"@id":"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/147b698444bab9b2e3a7437d9fb25d27","name":"Silvia Randaccio","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/bc4d8e5f48568bc086c341be304425a9d3f741f6ea8d5fd3e40680176927b09e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/bc4d8e5f48568bc086c341be304425a9d3f741f6ea8d5fd3e40680176927b09e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/bc4d8e5f48568bc086c341be304425a9d3f741f6ea8d5fd3e40680176927b09e?s=96&d=mm&r=g","caption":"Silvia Randaccio"}}]}},"_links":{"self":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/41922","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/comments?post=41922"}],"version-history":[{"count":1,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/41922\/revisions"}],"predecessor-version":[{"id":41923,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/41922\/revisions\/41923"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/media\/42023"}],"wp:attachment":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/media?parent=41922"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/categories?post=41922"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/tags?post=41922"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}