{"id":29305,"date":"2026-05-16T07:00:18","date_gmt":"2026-05-16T07:00:18","guid":{"rendered":"https:\/\/twproject.com\/blog\/?p=29305"},"modified":"2026-05-15T09:50:06","modified_gmt":"2026-05-15T09:50:06","slug":"project-hour-reporting-how-to-compile-a-report","status":"publish","type":"post","link":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/","title":{"rendered":"Project hour reporting: how to compile a report"},"content":{"rendered":"\n<p><strong>Hourly reporting<\/strong> is one of the key tasks in project management, both in the business world and in public sectors such as educational institutions.<\/p>\n\n\n\n<p>Creating a clear, accurate, and easy-to-read report allows you to keep costs under control, stay within budget, and prove that human resources are being allocated correctly.<\/p>\n\n\n\n<p>In this article, we\u2019ll take a look at how to set up an effective reporting system and which tools to use to simplify the entire process.<\/p>\n\n\n\n<div class=\"table-of-content\">\n<h5>CONTENT<\/h5>\n<ul>\n<li><a href=\"#ore\">What is hour reporting and why is it important?<\/a><\/li>\n<li><a href=\"#report\">How to structure a time sheet report<\/a><\/li>\n<li><a href=\"#twproject\">Twproject: a concrete example of management and reporting<\/a><\/li>\n<li><a href=\"#3\">3 common mistakes in hourly reporting and how to avoid them<\/a><\/li>\n<\/div>\n<p><a name=\"ore\"><\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong><strong>What is hour reporting and why is it important?<\/strong><\/strong><\/h2>\n\n\n\n<p>Hourly reporting involves logging, aggregating, and presenting the <a href=\"https:\/\/twproject.com\/blog\/calculating-working-hours-of-resources-heres-how-to-do-it\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>hours worked<\/strong><\/a> by each team member on one or more projects. It\u2019s not just a matter of noting start and end times: the goal is to link each hour worked to a specific project activity, phase, or deliverable.<\/p>\n\n\n\n<p>A robust hourly report allows you to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>check the actual progress of the project compared to what was planned;<\/li>\n\n\n\n<li>calculate the actual cost of the resources used;<\/li>\n\n\n\n<li>identify bottlenecks or tasks that take longer than expected;<\/li>\n\n\n\n<li>provide documentation to clients, lenders, or regulatory bodies.<\/li>\n<\/ul>\n\n\n\n<p>In many industries, from consulting to public administration, from European projects to schools, hourly reporting is a legal obligation. Those who work on grant-funded projects, for example, know full well how critical it is to produce accurate and verifiable documentation.<\/p>\n\n\n\n<p><a name=\"report\"><\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong><strong>How to structure a time sheet report<\/strong><\/strong><\/h2>\n\n\n\n<p>A successful report is structured logically and consistently. Here are the essential elements.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>1. Heading and date range<\/strong><\/strong><\/h3>\n\n\n\n<p>The <a href=\"https:\/\/twproject.com\/blog\/reporting-system-projects\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>report<\/strong><\/a> must clearly state the reference project, the time period (week, month, phase), the name of the contributor or team, and the person responsible for validation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>2. Timetable by activity<\/strong><\/strong><\/h3>\n\n\n\n<p>The centrepiece of the document is a spreadsheet that connects each workday to the tasks performed. Each row should include: date, resource name, task, hours worked, and relevant notes. This structure makes the document accessible to those who did not work directly on the project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>3. Summary by phase or work package<\/strong><\/strong><\/h3>\n\n\n\n<p>Along with daily details, it is helpful to include an aggregated summary by phase or <a href=\"https:\/\/twproject.com\/blog\/work-packages-relation-wbs\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>work package<\/strong><\/a>. This helps you quickly compare the estimated hours with the actual hours worked.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>4. Signature and validation<\/strong><\/strong><\/h3>\n\n\n\n<p>The report must be signed by the employee and countersigned by the project manager. In some cases, such as reports for public tenders, the signature of the organization\u2019s legal representative is also required.<\/p>\n\n\n\n<p><a name=\"twproject\"><\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Twproject: a concrete example of management and reporting<\/strong><\/h2>\n\n\n\n<p><strong>Twproject <\/strong>natively integrates <a href=\"https:\/\/twproject.com\/blog\/how-to-prepare-a-project-report\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>advanced reporting features<\/strong><\/a>. Let\u2019s take a look at some practical examples of how they\u2019re used.<\/p>\n\n\n\n<p><strong>\u2013 Weekly timesheet: <\/strong>Each team member can access their personal dashboard and fill out the weekly <a href=\"https:\/\/twproject.com\/blog\/how-to-use-timesheets-to-optimize-projects\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>timesheet<\/strong><\/a> directly in their browser. Hours are automatically assigned to the correct project and task. The manager receives a notification and can approve or request corrections with a single click.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"840\" height=\"471\" src=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2024\/05\/timesheet-1-840x471-1.png\" alt=\"calcolo ore di lavoro\" class=\"wp-image-23086\" srcset=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2024\/05\/timesheet-1-840x471-1.png 840w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/2024\/05\/timesheet-1-840x471-1-400x224.png 400w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/2024\/05\/timesheet-1-840x471-1-705x395.png 705w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><\/figure>\n\n\n\n<p><strong>\u2013 Reports for clients or funders: <\/strong>The project manager can generate an aggregated report by project in seconds, filtering by resource, period, or phase. The document is then exported to be sent to the client or attached to a formal report.<\/p>\n\n\n\n<p><strong>\u2013 Hourly budget control:<\/strong> with <strong>Twproject <\/strong>you can set an <strong>hourly budget<\/strong> for each task or phase. As your employees log their hours, the system updates the progress indicator in real time. This allows the team to intervene before the budget is exceeded, improve performance over time, and optimize future planning.<\/p>\n\n\n\n<p><strong>\u2013 Reporting on multiple projects.<\/strong> An <a href=\"https:\/\/twproject.com\/blog\/managing-several-projects-at-once\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>employee working simultaneously on multiple projects<\/strong><\/a> can allocate their hours across different activities on the same day. <strong>Twproject<\/strong> handles this complexity flawlessly, producing separate reports for each project or a consolidated overview.<\/p>\n\n\n\n<p><a name=\"3\"><\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong><strong>3 common mistakes in hourly reporting and how to avoid them<\/strong><\/strong><\/h2>\n\n\n\n<p>Even with high-quality tools, recurring errors can impact report quality.<\/p>\n\n\n\n<p><strong>1-<\/strong> The first is post-event data entry: many employees tend to log their hours at the end of the week or month, resulting in a loss of detail regarding individual tasks. It is crucial to implement a daily data-entry routine.<\/p>\n\n\n\n<p><strong>2-<\/strong> The second error is either excessive granularity or, on the contrary, vague descriptions. \u201c<em>Meeting<\/em>\u201d doesn&#8217;t say much; \u201c<em>Check-in meeting with Client X to review the communication plan<\/em>\u201d is much more useful for reporting purposes.<\/p>\n\n\n\n<p><strong>3-<\/strong> The third issue is the lack of validation. An unsigned and unapproved report has no legal or contractual value. The approval process must be integrated into the workflow, not left to personal initiative.<\/p>\n\n\n\n<p><strong>Hourly reporting on a project<\/strong> is not a paperwork chore, but a strategic management tool.<\/p>\n\n\n\n<p>Producing accurate, readable, and validated reports makes it possible to make better decisions, demonstrate the value of the work done, and maintain the trust of clients and funders.<\/p>\n\n\n\n<p>Tools like <strong>Twproject<\/strong> streamline this process by automating data collection and report generation, giving the team more time to focus on the work that truly matters.<\/p>\n\n\n\n<div id=\"blog-promo-box\">\n<div class=\"flex_column_table\">\n<div class=\"flex_column text_column\">\n<div>\n<h3>Work together with your team effectively<\/h3>\n<div class=\"avia-button-wrap avia-button-left\"><a class=\"avia-button avia-icon_select-no avia-color-custom avia-size-xlarge\" href=\"https:\/\/demo.twproject.com\/applications\/teamwork\/welcome\/createUserEnvironment.jsp\" target=\"blank\" rel=\"noopener\"><span class=\"avia_iconbox_title\"> Try it now!<\/span><\/a><\/div>\n<\/div>\n<\/div>\n<div class=\"flex_column photo_column\" style=\"background-image: url('https:\/\/static.twproject.com\/blog\/wp-content\/uploads\/2021\/09\/blog-banner-1.jpg');\"><\/div>\n<\/div>\n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Hourly reporting is one of the key tasks in project management, both in the business world and in public sectors such as educational institutions. Creating a clear, accurate, and easy-to-read report allows you to keep costs under control, stay within budget, and prove that human resources are being allocated correctly. In this article, we\u2019ll take &hellip; <a href=\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Project hour reporting: how to compile a report&#8221;<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":29307,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_custom_body_class":"","_custom_post_class":"","footnotes":""},"categories":[58,88],"tags":[],"class_list":["post-29305","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","category-resource-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Project hour reporting: how to compile a report - Twproject.com<\/title>\n<meta name=\"description\" content=\"Let&#039;s look at how to structure an effective time tracking system and which tools to use to simplify the entire process.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project hour reporting: how to compile a report - Twproject.com\" \/>\n<meta property=\"og:description\" content=\"Let&#039;s look at how to structure an effective time tracking system and which tools to use to simplify the entire process.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/\" \/>\n<meta property=\"og:site_name\" content=\"Twproject.com\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-16T07:00:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/05\/Rendicontazione-ore-per-progetto-come-costruire-un-report-840x560.webp\" \/>\n<meta name=\"author\" content=\"Twproject Staff\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Twproject Staff\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/\"},\"author\":{\"name\":\"Twproject Staff\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608\"},\"headline\":\"Project hour reporting: how to compile a report\",\"datePublished\":\"2026-05-16T07:00:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/\"},\"wordCount\":840,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/twproject.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/05\/Project-hour-reporting-how-to-compile-a-report.webp\",\"articleSection\":[\"Project management\",\"Resource management\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/\",\"url\":\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/\",\"name\":\"Project hour reporting: how to compile a report - Twproject.com\",\"isPartOf\":{\"@id\":\"https:\/\/twproject.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/05\/Project-hour-reporting-how-to-compile-a-report.webp\",\"datePublished\":\"2026-05-16T07:00:18+00:00\",\"description\":\"Let's look at how to structure an effective time tracking system and which tools to use to simplify the entire process.\",\"breadcrumb\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#primaryimage\",\"url\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/05\/Project-hour-reporting-how-to-compile-a-report.webp\",\"contentUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/05\/Project-hour-reporting-how-to-compile-a-report.webp\",\"width\":960,\"height\":640,\"caption\":\"project hour reporting twproject project management software\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/twproject.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project hour reporting: how to compile a report\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/twproject.com\/blog\/#website\",\"url\":\"https:\/\/twproject.com\/blog\/\",\"name\":\"Twproject.com\",\"description\":\"Twproject is a full featured web based project management software that gives you full visibility and control over your projects.Twproject is also a time tracking software, a bug tracking software, a project planning software.\",\"publisher\":{\"@id\":\"https:\/\/twproject.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/twproject.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/twproject.com\/blog\/#organization\",\"name\":\"Twproject - Project Management Software\",\"url\":\"https:\/\/twproject.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png\",\"contentUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png\",\"width\":331,\"height\":110,\"caption\":\"Twproject - Project Management Software\"},\"image\":{\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608\",\"name\":\"Twproject Staff\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g\",\"caption\":\"Twproject Staff\"},\"sameAs\":[\"twadmin\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project hour reporting: how to compile a report - Twproject.com","description":"Let's look at how to structure an effective time tracking system and which tools to use to simplify the entire process.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/","og_locale":"en_US","og_type":"article","og_title":"Project hour reporting: how to compile a report - Twproject.com","og_description":"Let's look at how to structure an effective time tracking system and which tools to use to simplify the entire process.","og_url":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/","og_site_name":"Twproject.com","article_published_time":"2026-05-16T07:00:18+00:00","og_image":[{"url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/05\/Rendicontazione-ore-per-progetto-come-costruire-un-report-840x560.webp","type":"","width":"","height":""}],"author":"Twproject Staff","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Twproject Staff","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#article","isPartOf":{"@id":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/"},"author":{"name":"Twproject Staff","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608"},"headline":"Project hour reporting: how to compile a report","datePublished":"2026-05-16T07:00:18+00:00","mainEntityOfPage":{"@id":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/"},"wordCount":840,"commentCount":0,"publisher":{"@id":"https:\/\/twproject.com\/blog\/#organization"},"image":{"@id":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#primaryimage"},"thumbnailUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/05\/Project-hour-reporting-how-to-compile-a-report.webp","articleSection":["Project management","Resource management"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/","url":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/","name":"Project hour reporting: how to compile a report - Twproject.com","isPartOf":{"@id":"https:\/\/twproject.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#primaryimage"},"image":{"@id":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#primaryimage"},"thumbnailUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/05\/Project-hour-reporting-how-to-compile-a-report.webp","datePublished":"2026-05-16T07:00:18+00:00","description":"Let's look at how to structure an effective time tracking system and which tools to use to simplify the entire process.","breadcrumb":{"@id":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#primaryimage","url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/05\/Project-hour-reporting-how-to-compile-a-report.webp","contentUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2026\/05\/Project-hour-reporting-how-to-compile-a-report.webp","width":960,"height":640,"caption":"project hour reporting twproject project management software"},{"@type":"BreadcrumbList","@id":"https:\/\/twproject.com\/blog\/project-hour-reporting-how-to-compile-a-report\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/twproject.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Project hour reporting: how to compile a report"}]},{"@type":"WebSite","@id":"https:\/\/twproject.com\/blog\/#website","url":"https:\/\/twproject.com\/blog\/","name":"Twproject.com","description":"Twproject is a full featured web based project management software that gives you full visibility and control over your projects.Twproject is also a time tracking software, a bug tracking software, a project planning software.","publisher":{"@id":"https:\/\/twproject.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/twproject.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/twproject.com\/blog\/#organization","name":"Twproject - Project Management Software","url":"https:\/\/twproject.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png","contentUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png","width":331,"height":110,"caption":"Twproject - Project Management Software"},"image":{"@id":"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608","name":"Twproject Staff","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g","caption":"Twproject Staff"},"sameAs":["twadmin"]}]}},"_links":{"self":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/29305","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/comments?post=29305"}],"version-history":[{"count":3,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/29305\/revisions"}],"predecessor-version":[{"id":29310,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/29305\/revisions\/29310"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/media\/29307"}],"wp:attachment":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/media?parent=29305"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/categories?post=29305"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/tags?post=29305"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}